Health

Covid-19 100 Bed Hospital to be constructed in Ghor

Saturday, September 19, 2020
Kabul (BNA) Acting Ministry of Public Health, Ahmad Jawad Osmani, told a news conference in Kabul yesterday that a 100-bed Covid-19 hospital would be built in Ghor.
He said that the contract was signed with the National Development Company in the presence of President and the Vice Presidents.
According to him, this hospital will be built and put into operation within six months.
It is said that, forty school children have recently infected the coronavirus.
Meanwhile, local officials in Ghor say thousands of residents in the province are without access to health care.
T. Yarzada

Show More

Related Articles

Back to top button